RTIO Pelican Rail Renewal

RTIO Pelican Rail Renewal

Client

Downer EDI

Location

Pilbara, Western Australia

Category

Rail Infrastructure

Duration

February – November 2022

Scope of Works

Halo provided a highly skilled multi-disciplined workforce to assist our client Downer and RTIO to achieve impressive milestones, installation of complex turnouts, and the utilisation of innovative lifting technology.

These efforts resulted in exceptional outcomes in terms of safety, productivity and quality, showcasing the team’s dedication to delivering critical maintenance and renewal works.

About the Project

The Rail Network Renewal projects. The RTIO rail network is the largest privately-owned and operated rail system in Australia.

As part of the Rail Network Renewals project, the major renewals teams have produced six campaigns of over the last 9 months: Pelican, Ibis, Gecko, and Gull. The scope included deconstruction and replacement of track, turnouts, and rail crossings, with necessary ground formation treatment to ensure efficient rail operations in the future..

Denny Avenue Level Crossing Removal

Halo Civil - Denny Avenue Crossing Project

Denny Avenue Level Crossing Removal

Client

Downer

Location

Kelmscott, WA

Category

Civil – Rail

Completed

January 2023

Scope of Works

Halo’s provided 40 personnel to assist with the delivery of the critical infrastructre works across various disciplines including, drainage, pavement, sub ballast capping, rail works, earthworks providing the following resources:

About the Project
The Denny Avenue Level Crossing in Kelmscott was the first crossing to be removed under the METRONET Level Crossing Removal program and permanently closed on 1 April 2021.
 
With the boom gates down an average of one minute and 44 seconds each crossing and a total average closure of three hours and seven minutes per day, removing this crossing increased the safety of pedestrians, cyclists and motorists, as well as reducing road congestion and revitalising the local area.
 
With the level crossing permanently closed, a new east-west connection rail-over-road underpass was built at Davis Road.
Halo Civil - Denny Avenue Crossing Project
“Peter’s team Halo, reacted very quickly as we accelerated dates for a major possession on Denny Avenue Level Cross Removal Project.  Halo assisted in the switch over of the existing rail, to new alignment to rail bridge. We had a wide range of personnel from Supervisors, machine operators and skilled labour who all performed really well and were fully integrated into the team.”
Lee Stewart
Project Director, Downer

Thornlie Cockburn Link Rail Blockade

Halo Civil - Cockburn Link Rail Blockade

Thornlie Cockburn Link Rail Blockade

Client

NEWest

Location

Perth, Western Australia

Category

Civil – Rail

Completed

January 2022

Scope of Works

The Mandurah rail line was blockaded (closed) between Glen Iris and Cockburn to reconstruct the Mandurah line tracks on a new alignment to make space for the future construction of the new Thornlie-Cockburn Link. This was the longest ever blockade of a PTA line and affected the busiest section of the network.

Halo provided innovative solutions that inclded laying the ballast using a ballast box and walking floor trailers which greatly increased the efficiency of the ballast laying operation while reducing ballast waste.

Halo’s scope of works included:

About the Project
The Thornlie-Cockburn Link will be Perth’s first east-west cross line connection, providing a higher level of public transport service to Perth’s south-eastern suburbs.
 
The works were successfully completed, and the line was handed back to passenger service on schedule at full line speed (130 km/h) and without operational restriction, the first time this has happened after a major blockade on the PTA network.
Halo Civil Cockburn Rail Blockade 2

Thornlie Cockburn Link

Halo Civil Engineering Cockburn Thornlie Misc Civil (2)

Thornlie Cockburn Link

Client

NEWest

Location

Perth, Western Australia

Category

Civil Infrastructure

Duration

Ongoing

Scope of Works

Following the successful delivery of the Thornlie Cockburn Link Christmas Blockade, NEWest engaged Halo Civil Engineering to conduct miscellaneous civils on the project. Halo’s scope of works included bulk and detailed earthworks, drainage, pavement works, rail embarkment and utilities.

Halo provided the following resources:

About the Project
The Thornlie-Cockburn Link will be Perth’s first east-west cross line connection, providing a higher level of public transport service to Perth’s south-eastern suburbs.
 
For 20 days between 26 December 2021 and 14 January 2022 the Mandurah rail line was blockaded (closed) between Glen Iris and Cockburn to reconstruct the Mandurah line tracks on a new alignment to make space for the future construction of the new Thornlie-Cockburn Link. This was the longest ever blockade of a PTA line and affected the busiest section of the network.
 
The works were successfully completed, and the line was handed back to passenger service on schedule at full line speed (130 km/h) and without operational restriction, the first time this has happened after a major blockade on the PTA network.

Wanneroo Road and Morley Drive Intersection Upgrade

Wanneroo Road and Morley Drive Intersection Upgrade

Client

Highways Construction 

Location

Perth, Western Australia

Category

Civil Infrastructure

Completed

August 2022

Scope of Works

Halo scope of works included supplying plant and labour resources to deliver:

About the Project
Wanneroo Road and Morley Drive intersection is one of the most congested in Perth with more than 25,000 vehicles using the intersection daily. In the five-year period up until the end of 2020 there was a total of 192 reported crashes, 90 percent of which were rear end crashes.
 
Halo’s client, Highways Construction Pty Ltd were awarded the construction contract to deliver the upgrades, which included adding or extending traffic lanes on all four approaches to the intersection as well as installing new bus lanes.
 
The $20 million Wanneroo Road and Morley Drive project was jointly funded, by the Australian and Western Australian governments committing $10 million each.
“Halo's exceptional services played a pivotal role in the successful and timely completion of the Wanneroo Road and Morley Drive intersection upgrade. Their professionalism and commitment to quality have made them a valued partner to Highway Construction Pty Ltd.”
Eugene O'Neill
Senior Site Supervisor - High Construction

Mitchell Freeway Southbound Upgrade

Mitchell Freeway Southbound Upgrade

Client

HWA 

Location

Perth, Western Australia

Category

Civil Infrastructure

Duration

Ongoing

Scope of Works

Halo has been engaged by H2H (NRW Contracting and WBHO Infrastructure JV) to assist in the delivery of the Mitchell Freeway Southbound Upgrade – Hodges Drive to Hepburn Avenue since 2021. Halo’s scope of works included earthworks, pavement construction, utility infrastructure and drainage. providing civil contracting and plant and labour resources.

About the Project

Mitchell Freeway is the main arterial road that connects the northern suburban areas with Perth’s CBD. During the morning peak hour commute there are bottlenecks at Erindale Road, Whitfords Avenue and Ocean Reef Road causing delays.

Widening the freeway from Hodges Drive to Hepburn Avenue is part of an overall strategy to improve performance of the Mitchell Freeway. The project will provide an extra southbound lane on the Mitchell Freeway between Hodges Drive and Hepburn Avenue.

Halo worked with H2H to provide skilled civil plant and labour resources to work on this important freeway construction and upgrade.